<
>
Texas Parks & Wildlife
Lake Somerville State Park
Birch Creek Waste Water Treatment Facility Upgrades
This $2.1M project is located on 25 acres within a State Park consisting of new water treatment system with a natural lagoon treatment. Project consists of constructing a Facultative Lagoon, two (2) stabilization ponds, and one (1) irrigation pond with amended soil liners with permanent erosion control measures. This project includes tie-ins to existing force mains routed to the new natural lagoon treatment system, new irrigation fields, and multiple man holes, T-Valve Manholes, and a large irrigation and recirculation pump station for proper treatment, and security fencing around the plant. Scope of work included demolition and removal of existing 40 year old package treatment plant with removal of existing sediment lagoons, including necessary soil abatement measures. New treatment system includes new 3-phase power to the site with related power equipment and controls for a fully operational water treatment system. G2 is currently replacing internal components within nine of the eleven existing pump stations throughout the park with new pump control modules to feed the treatment plant. Jamison currently acts as the Project Manager on the project.
<
>
Lightner Creek Bridge
Durango Colorado
$240,000 CM/GC delivery where G2 Contractors took the lead to hire a structural engineer, civil engineer, and bridge engineer. G2 was contracted directly to perform pre-construction services for all aspects of the project, including coordination with the Army Corp of Engineers and La Plata County Floodplain requirements. Project consists of 300 linear feet of drive on steep slopes in conjunction with a 38’ x 12’ pre-engineered Steadfast Vehicular bridge by Contech Engineered Solutions with a concrete deck and guardrails. Upon negotiation of pricing, G2 Contractors entered into a lump sum agreement to construct the bridge, drive, retaining walls, and abutments. G2 was hired due to its experience with difficult projects with this specific project having a high degree of difficulty due to steep mountainous terrain involving a drainage area and limited accessibility. Jamison is currently acting as both Project Manager and Superintendent on this project due to its level of difficulty.
<
>
Texas Parks & Wildlife
San Jacinto Battleground
SHS Bulkhead Repairs
Rehabilitation of the bulkhead along the Houston Ship Channel, construction of an ADA walkway along the bulkhead from the Battleship Texas entrance on the north to the restroom on the south, and minor restroom upgrades. The project was funded by a grant from US Fish & Wildlife during one of the wettest years on record.
<
>
Texas Historical Commission
Nimitz Museum Historic Re-roof
A high profile project on a main street in Fredericksburg, Texas involving the reroof of a historic structure.
<
>
Texas Parks & Wildlife
Powderhorn Ranch
This was another design build project with the Texas Parks & Wildlife Foundation and Texas Park & Wildlife Department. Located on the coast of Texas, this project involved the interior and exterior of a historic bunk house. Work included bringing all utilities up to current standards, adding two restrooms and a kitchen. Additionally, G2 designed and built a metal maintenance building that included a concrete foundation and electrical.
<
>
US Forest Service
Hermosa Creek Restoration
The project included 100+ boulders for bank stabilization and instream habitat improvement. The bank revetment work entailed keying in boulders into the stream bed, and stacking 2 to 3 courses of boulders to ensure the revetment higher than that of flood stage levels. The bank revetment was backfilled with excavated material from the stream bed. The angle of repose from the flood plain to the top course of boulders was approx. 3:1 when complete. The instream fish habitat structures included cross-vanes, vortex weirs, offset J-hook structures, and boulder clusters constructed of rocks that were set at a grade so they can effectively scour pools below the structure and effectively mobilize fine sediment during high flows of the creek. Spacing was spread out far enough to ensure sufficient grade upstream of each structure to prevent deposition of fine material. Each structure was keyed into the bank revetment, and placed on footer rocks installed in the stream bed to ensure longevity and proper function. Structures were placed at angles that prevented excessive pressure on the banks of the stream. Work at the Middle East Fork Site included diverting water using an instream structure from multiple channels into the largest channel to increase the efficacy of the instream structures in this stream reach. Jamison was on-site throughout the entire project and acted as the Project Manager on the project.
<
>
Texas Parks & Wildlife
Juniper Camping Loop
Palo Duro Canyon State Park
G2 was hired to develop a new 38 site camping loop including all site work, utilities, paving, fire pits and shade shelters.
<
>
Moab, Utah
Bureau of Land Management
Installation of multiple Prefabricated Shade Shelters
in the Moab, UT District.
Palo Duro Canyon State Park
Canoncita Renovation
Renovation of an historic building in a remote location above Palo Duro canyon near Amarillo, TX. Work included demolition, upgrading electrical, plumbing, and HVAC. Installing new flooring, intricate ceiling, cabinets, windows and doors.
<
>
Texas Parks & Wildlife
Brownwood State Park, Texas
Emergency re-roof of a historic building including repair of subsurface and fascia materials.
<
>
Texas Parks & Wildlife
Abilene State Park, Texas
Complete tear-off of the single-ply low slope roofing at the flat roof areas of the Concession building and replace with matching single ply EPDM roofing system. Repair roof decking and framing, and clean and repair parapet walls.
<
>
Cross Timbers Health Clinic
Dental Clinic Addition
Reconfigure existing office space into a new dental clinic. Construction was conducted while keeping the existing facility operational. Work included the installation of dental equipment, custom cabinetry, new electrical and plumbing.
<
>
Weatherford Regional
Medical Center
Physical Therapy Building
Renovate existing building from offices to physical therapy center including electrical, mechanical, flooring, paint and specialty equipment.
Weatherford Regional
Medical Center
Data Center Expansion
G2 was brought in to expand this point-to-point merchandising company’s data center, which required precise critical path scheduling, cleanliness to maintain ongoing operations and safety.
Texas Neighborhood Services
G2 Contractors has performed work for Texas Neighborhood Services (TNS) at most of its locations including Weatherford, Decatur, Corsicana, Mineral Wells, Granbury and Stephenville.
<
>
Anderson Merchandisers
Data Center Expansion
G2 was brought in to expand this point-to-point merchandising company’s data center, which required precise critical path scheduling, cleanliness to maintain ongoing operations and safety.
Texas Parks & Wildlife
Possum Kingdom Lake State
Wastewater Force Main Repairs
Jetting and pipe repairs to approximately 4,000 LF of 4” force main including connections to lift stations and evacuation of sewage. Included installation of two-way cleanouts every 600’. Included all exploratory work to find problem areas and bring State Park sewer system back online.
G2 Contractors LLC
PO Box 1596
Mason, TX 76856